Foshan Duoke High-end Custom Furniture Co., Ltd. manufactures project-specific guestroom, suite and public-area furniture according to BOQs, design drawings, room schedules and approved material samples. Our team coordinates fixed furniture and loose furniture from drawing review and mock-up approval through bulk production, inspection and room-by-room packing.
Verified production facility with panel processing, assembly and finishing capabilities.
Supplying furniture for Marriott, Hilton and IHG hotel projects based on approved specifications.
Wardrobes, headboards, desks and seating supplied as a coordinated package.
BOQ reviews, furniture drawings, finish samples and inspection records for project compliance.
Furniture supplied for selected hospitality projects worldwide.
Examples of custom furniture produced for international hotel brands, showing coordination across guestrooms and public areas.
[Loose Furniture]
Scope: Guestroom casegoods, wardrobes, bedside tables, desks, chairs and upholstered seating.
Project requirement: The approved room package used coordinated timber stains, metal details and upholstery across repeated room types.
Production response: Material references were retained after sample approval, furniture packages were identified by room type, and selected bulk units were assembled for comparison before packing.
[Loose & Fixed Furniture]
Scope: Lobby furniture, lounge seating, restaurant tables and custom reception casegoods. with hotel bedroom
Project requirement: Large-scale stone components and moisture-resistant core materials required for tropical public areas.
Production response: Stone thicknesses and support structures were reviewed through shop drawings. Packages were crated specifically for sea freight and site handling.
[Loose Furniture]
Scope: Built-in wardrobes, kitchen cabinetry, loose living room furniture and bedroom sets.
Project requirement: Phased delivery schedule matching the contractor's floor-by-floor handover plan.
Production response: Production batches were aligned with the installation sequence. Packing lists were separated by floor to prevent site congestion.
Custom guest room furniture manufactured for hotel projects, including beds, headboards, nightstands, wardrobes, TV units, desks, minibars and luggage benches.






Custom loose furniture for hotel guest rooms, lobbies, lounges, restaurants and public areas, manufactured according to project drawings, materials and finish requirements.
Factory direct sale, reducing middleman costs. Custom made furniture, one pcs is available. Perfectly Finished For Every Order!
From design drawings to finished hotel rooms, DUOKE provides custom furniture manufacturing for hospitality projects
We turn your drawings, specifications and material requirements into durable hotel furniture, with mock-up development, production control and project-based delivery.
Direct factory production from raw material processing to furniture manufacturing, inspection and packing.
DUOKE manufactures custom guest room furniture, loose furniture, fixed furniture, lobby furniture and restaurant furniture according to project drawings and specifications.
Founded in Foshan, China, DUOKE specializes in customized hotel furniture production for international hospitality projects. Our team supports drawing review, material confirmation, sample production, bulk manufacturing, inspection and delivery coordination.
Trade exhibitions give Duoke’s team direct contact with hotel developers, procurement companies, designers and contractors from different markets. These discussions often begin with room counts, project drawings, material references, delivery locations and opening schedules rather than a standard product catalogue.
If it is inconvenient for you to come, we can arrange online video conferencing to let you know more about our factory? Then you can see if we meet the requirements. Each supplier has their own advantages. What kind of suppliers are you looking for?
From design development and mock-up approval to production, quality inspection, packing and delivery, DUOKE manages every stage of your hotel furniture project.
Share your drawings, specifications and design requirements with our team for technical review, material confirmation and furniture development.
Before bulk production, we prepare mock-up furniture or a sample room to confirm dimensions, materials, finishes and construction details.
After sample approval, bulk manufacturing begins according to the confirmed drawings, materials and project specifications.
Our QC team checks dimensions, finishes, upholstery, hardware and workmanship before the furniture is approved for packing.
Hotel furniture is protected with suitable inner wrapping, corner protection and export-grade packing to reduce damage during handling and shipping.
Orders can be packed and shipped by room type, floor, building or project phase to support smoother site receiving and installation.
Custom hotel furniture developed, produced and inspected according to approved project requirements.
Choosing a hotel furniture manufacturer involves more than comparing prices. A dependable supplier should understand BOQs, furniture drawings, room schedules, material specifications and installation requirements. They should also be able to coordinate guestroom furniture, loose furniture and public-area items under one approved design and finish standard.
Duoke supports hotel projects from drawing review and material confirmation to mock-up approval, bulk production, quality inspection and project-based packing. Furniture can be identified by room type, floor or installation area, helping procurement and site teams control quality, reduce coordination problems and manage phased installation more efficiently.
Select a furniture category to review common structures, material options and project applications. Every item can be developed from the hotel designer’s drawings, reference images and finish schedule.
Coordinated guestroom packages can include beds and headboards, bedside tables, wardrobes, desks, chairs, luggage benches and lounge seating. Dimensions follow the approved room layout, while veneer, lacquer, metal, stone and fabric references are matched to the mock-up room schedule.
Explore Hotel Bedroom Furniture
Lobby furniture is developed around circulation routes, seating capacity and the interior designer’s material palette. Sofas, lounge chairs, coffee tables, consoles and reception-area furniture can be coordinated across public areas without mixing unrelated finishes from different suppliers.
Explore Hotel Lobby Furniture
Hotel desks and chairs are produced to suit guestroom widths, lighting locations and daily workspace use. Desk construction can coordinate drawers, cable openings, metal details and specified power-access positions, while chair dimensions and upholstery follow the approved room design.
Explore Hotel Desks and Chairs
Guestroom and lobby sofas can be developed with timber or metal frames, project-specified foam, fixed or removable cushions and selected upholstery. Seat depth, arm height and overall width should be confirmed against room circulation and cleaning access before production.
Explore Hotel Sofas
Hotel wardrobes can be manufactured as built-in or freestanding units according to wall openings, skirting details and room elevations. Interior layouts may coordinate hanging rails, shelves, drawers, minibar areas and specified lighting or hardware positions.
Explore Hotel Wardrobes
Bedside tables are developed around bed height, headboard construction and electrical positions. Drawer layouts, stone or timber tops, metal details and charging-access openings are confirmed through shop drawings before the bulk order is released.
Explore Hotel Bedside TablesHotel furniture purchasing is affected by room repetition, opening dates, installation access and approval procedures. The following controls are designed around those project conditions rather than retail furniture purchasing.
When a guestroom package includes timber, veneer, stone, metal, upholstery and hardware, an unclear quotation can create changes after production begins. Duoke reviews the BOQ, drawings and finish schedule together, identifies missing information and confirms material substitutions before the final production scope is approved. This gives the procurement team a clearer basis for comparing quotations and controlling later additions.
A delayed furniture package can hold back room handover even when flooring, lighting and MEP work are complete. The production schedule should separate drawing approval, mock-up preparation, material confirmation, bulk manufacturing, inspection and shipping. For phased projects, packages can be grouped by building, floor or room type so the site team can release completed areas earlier.
A finish that looks acceptable on one sample may become visibly inconsistent when repeated across hundreds of rooms. Veneer tone, timber stain, lacquer sheen, metal finish, stone pattern, fabric and hardware references should be recorded after mock-up approval. Bulk units are then compared with the same approved references before packing, reducing on-site sorting and avoidable replacement work.
Housekeeping teams clean bedside tables, wardrobes, desks and upholstered seating every day. Exposed edges, recessed handles, fabric selection, removable cushions and access around furniture affect maintenance time. Duoke can review these details with the designer before production so the final construction is compatible with the hotel’s cleaning routine and replacement plan.
The team reviews quantities, room types, furniture references, dimensions and material descriptions. Missing sizes, unmatched item codes and conflicting specifications are listed for confirmation before costing.
Production dimensions, joints, access panels, drawer layouts, cable openings and installation interfaces are clarified through furniture drawings. Built-in wardrobes and headboards should be checked against wall openings, skirting and electrical positions.
Veneer, timber stain, lacquer sheen, metal finish, stone, fabric and hardware samples are submitted according to the project specification. Each approved reference should be labelled and retained for bulk comparison.
For projects requiring a sample room, the furniture package is assembled and reviewed before bulk release. The approval record should include dimensions, finish comments, hardware changes and any revisions requested by the designer or hotel team.
Bulk production follows the approved drawings and sample references. Selected units are assembled before packing, with dimensions, visible finishes, hardware operation and package labels recorded in an inspection list.
Guestroom casegoods and wardrobes may combine plywood or MDF cores with wood veneer, laminate, lacquered surfaces or other specified finishes. Solid timber reinforcement can be added at load-bearing joints where required by the construction. Core material, thickness and edge treatment must follow the approved drawings rather than a generic factory standard.
Desk tops, bedside table tops and lobby tables can be developed in quartz, sintered stone, natural stone, solid timber or veneered panels according to the design. Edge profile, thickness, support structure and transport weight should be confirmed before production, especially for large stone components.
Sofas and chairs are developed around the specified frame, foam construction, seat depth, fabric direction and fire-performance requirement. When removable covers, replacement cushions or stain-resistant upholstery are required, these details must be confirmed during material approval rather than added after bulk production.
Hinges, drawer slides, handles, hanging rails, cable openings and electrical-access positions are selected according to the furniture drawing and expected use. Hardware models should remain consistent across the approved production batch to simplify future maintenance and replacement.
Hotel furniture is not always installed in the same sequence in which it is produced. Packages can be identified by product code, room type, floor or installation area so the receiving team can separate guestroom furniture from lobby or public-area items.
Depending on access conditions, furniture may be shipped assembled, partially assembled or knock-down. Large wardrobes, headboards, stone components and upholstered items require different protection methods, so packing should follow the product structure and site access rather than one carton format for every item.
For phased projects, separate packing lists and shipping batches can be prepared around the agreed installation sequence. This helps the site team avoid opening unrelated packages while completed floors are being handed over.
Hospitality projects may require material certificates, fire-performance reports, product data sheets, finish schedules and packing records before handover. The exact requirement depends on the hotel brand, project location, consultant specification and product category.
Duoke provides the documents available for the selected material and production scope. Certificate names, test standards, issuing laboratories and validity dates must be shown exactly as stated in the original document. A general certificate must not be presented as proof for an unrelated fabric, foam, board or finished product.
Watch how a hospitality furniture order moves from panel preparation and veneer processing to assembly, finishing, hardware installation, inspection and packing. The video should show the actual production environment and the types of furniture supplied for hotel guestrooms and public areas.
Review common questions regarding BOQ submission, custom manufacturing, material matching and project delivery.
Veneer, timber stain, lacquer, metal, stone, fabric and hardware references can be developed from the project specification or submitted sample. Final bulk production should follow an approved and labelled reference rather than photographs alone, because lighting and screen settings can alter colour appearance.
Share your BOQ, furniture drawings, room schedule or material specification. Duoke will review the product scope, identify missing information and organise the quotation around the confirmed room types, quantities and delivery requirements.
Send the BOQ, room quantity or furniture drawings to our project team on WhatsApp.
Chat with Duoke on WhatsApp+86 133 9275 8858
Email: loiszhang@duokecustomfurniture.com
Address: xiqiao nanhai area foshan guangdong china
Page reviewed by Foshan Duoke High-end Custom Furniture Co., Ltd. | Last updated: October 2023